Projects
Surface Drainage And Flood Control Study. Date of Implementation 2006
PROJECT CLIENT
Great Man-Made River Project
Phase One Water Utilization Authority
Benghazi, Libya
PROJECT SUMMARY
Technical study to eliminate and control flood in the vicinity area of Al-khadra irrigation projects. the project consists of overall review to the design base criteria and channels detail designs and also to determine available/alternative chooses to improve plan of drainage scheme.